What happens at each stage, and who does the work.

Tom is your contact from the first site visit to the final handover. Where someone else is involved, the stage says so.

First visit

Tell us the scope, your timing and your budget. Bring drawings if you have them.

  1. Enquiry

    Call, email or use the form. We’ll ask about the scope, your timing, your budget and any drawings.

    You get
    A site visit booked.
  2. Site visit

    Tom visits, measures up and talks through the options and the constraints: heritage, strata and council.

    You get
    The options and constraints, talked through on site.
  3. Designers

    We build from your architect’s or interior designer’s drawings, and offer practical detailing input along the way.

    You get
    Drawings to price and build from.
    With
    Your designer, with Tom
  4. Approvals

    Some jobs need council, heritage or strata approval. Tom talks you through what applies at the site visit.

    You get
    Approval to build.
    With
    Your designer or certifier
17 Sep 2026 · Before · Camperdown

Quote

An itemised quote, and a contract that fits the job.

  1. Detailed quote

    An itemised scope and price, with clear inclusions and exclusions.

    You get
    A quote you can read line by line.
  2. Contract and insurance

    A written contract, lump sum (a fixed price) or cost-plus (actual costs plus an agreed margin), and Home Building Compensation Fund insurance for jobs over $20,000.

    You get
    A written contract before work starts.
    With
    You and Tom

Build

Updates through the client portal, and nothing extra without your OK in writing.

  1. Starting on site

    We set up the site and protect what’s staying: floors, lifts and common areas, with dust control as standard.

    You get
    Scheduled trades and a protected home.
  2. Stages

    Demolition, structure, services, linings, fit-off and finishes, in roughly that order.

    You get
    Updates through the client portal.
    With
    Tom and the trades he schedules
  3. Changes

    Variations are agreed in writing before the work is done.

    You get
    A written variation to approve.
28 Sep 2026 · Materials in the laneway · Camperdown

Handover

We don’t disappear when the skip does.

  1. Handover

    A final walkthrough and a clean.

    You get
    Documentation and warranty information.
  2. Defects period

    We come back for any defects.

    You get
    Fixes, as the contract sets out.
  3. Statutory warranty

    On residential work, NSW law also gives you statutory warranties: 6 years for major defects and 2 years for other defects.

    You get
    Protection that doesn’t depend on us.
    With
    T.O.C. Build
October 2026 · Restored deck · Alexandria

Questions people ask first.

Are you licensed and insured?

Yes. Contractor licence 502858C and Home Building Compensation Fund cover on jobs over $20,000.

Do you work with my architect or designer?

Yes. We build from architect and interior designer drawings, and help with practical detailing during tender and construction.

Which suburbs do you cover?

The Inner West, the City of Sydney, the Eastern Suburbs and the Lower North Shore.

Who will I deal with?

Tom. He’s your contact from the first site visit to the final handover.

Wherever you’re up to, start with a call.

Or send the details through the form.