October 2025 · Deck under hardwood rafters · Summer Hill

A second storey, and a deck under hardwood rafters.

A brick house in Summer Hill gained a second storey and a new back deck. Steel posts and beams carry the roof over the deck, and the rafters are left exposed.

Blackbutt overhead and underfoot.

The deck is blackbutt, and so is the batten ceiling under the roof. Upstairs, the new rooms sit on a band of face brick with timber sills.

From the first steel to the oiled deck.

Tom’s photos follow the job from March to December 2025: steel frame, roof, deck boards, oil, then the batten ceiling.

Upstairs, face brick and timber sills, December 2025

Tom’s site photos, 2025

  1. 21.03

    Frame

    Sunset on site, from the new frame.

  2. 30.05

    Steel

    Steel posts and beams up over the back of the house.

  3. 02.09

    Roof

    Roof sheeting going on over the deck.

    2 Sep 2025 · Roof sheeting · Summer Hill
  4. 08.10

    Deck

    Blackbutt boards going down over the joists.

  5. 14.10

    Oil

    The deck oiled.

  6. 06.11

    Battens

    Blackbutt battens under the roof.